Monday, November 24, 2008

Weekend of 22 and 23 November 2008.
Oh boy, was it windy. Blowing an absolute gale all weekend so didn't see any aircraft movement.
Our first visit to hangar with the concrete floor down. How different it looks - but really pleased with the result.
Despite the wind blowing anything and everything out the back door, Stan marked out the floorplan for the caretakers residence. We really could have done with the main hangar door to keep the wind out.
A big day on Monday as Stan arranged the construction for the sliding doors with Cobram Windows (also to keep wind out).
A visit from Tony Parr from Moira Shire and Grant Case from Cobram Plumbing and Engineering to organise the Driveway crossing and other council related connections.
Also on Monday Glen Saunders dug a trench enabling our electrician, Alan Campbell, to insert underground cables, then install our metre box and put all in order for the electricity to be connected.

No comments: