Thursday, May 28, 2009

We went to the hangar late Friday 8th May with Stan intending to stay until the following weekend and I was going back to Pakenham Sunday and return for him the following weekend. Plans changed quickly with the return of Peter and Anne McLean's Megafauna trip when I managed to obtain a ride home Saturday afternoon.
I left Stan with enough food to last the week (not sure why he's losing weight!) and he accomplished a lot.
Cobram Plumbing and Engineering had delivered the upstairs shower base and flashings to complete the windows, so before Van Steensel Timbers delivered a load of timber and other building materials early Tuesday, Stan had completed the remaining downstairs windows.
He took half a day and made up the stairs so we no longer have to rely on the ladder.
We're not sure why Stan couldn't get any takers to help lift the shower base up the ladder, but once the stairs were in place the shower base was taken up and glued in position.
He was then able to complete the frame for upstairs bathroom and toilet, including the cavity sliding doors.