Saturday 1 November 2008.
Most of the walls are now completed, the guttering is on and now only the Colorbond barging and corner flashings required, and things are great.
Inside looks very large, but the back six metres will be taken up with the caretakers residence.
Openings have been inserted in readiness for sliding glass doors and of course our 16 metre wide main door to taxiway will still be a few weeks away.
The residence plumbing has been installed by Cobram Plumbing and Engineering, and Glen Saunders (from Yarrawonga) was busy levelling packing sand and digging trenches for concrete beams.
Our concretor, Brian Godfrey, all the way from O'Connell (near Bathurst) in New South Wales was readying the site prior to concrete pour on Tuesday 4 November for the residence section. The remainder to be poured several days later.
We painted tar onto inside of Colorbond, below lowest girt prior to concreting to form an isolation barrier between the Colorbond and concrete. (You might be able to see the black tar on the lowest section of the wall in the background of the photo of Brian Godfrey).